UPGRADING OF NSANAMA-NAYUCHI ROAD (MOZAMBIQUE BORDER) -T393

The Nsanama-Nayuchi/Mozambique Border Road section is approximately 44 km long with very sandy soils. The road starts at Nsanama and ends at Nayuchi on the Mozambique border. It passes through two trading centres, namely Mbanila and Namanja. The scope of works under this project is the upgrading of 10km of road section from Nsanama to Nkhande Bridge towards Nayuchi.The works will include construction of a 6.7m wide carriageway and 1.5m wide sealed shoulders on each side of the road. The pavement layers will be constructed from natural gravels with 50mm Asphalt Concrete surfacing.

The project will have many benefits to the people along the road and to the country as a whole. Some of the benefits will include; 1. Road Maintenance costs With the new road construction from earth to bituminous surfaced standard, the road will operate in an all-weather condition. Ultimately, emergency maintenance works during the rainy season and costs will be reduced as concentration will be on routine maintenance activities such as drainage structures cleaning, line marking, grass cutting and patching of any potholes that may develop. The road has been raised to prevent over flooding / overtopping during rainy season which will make travel safety all year round. 2 Vehicle Operating and Passenger Travel costs Vehicle operating costs savings constitute the most important benefit attributable to the project. This will have direct reduction on maintenance cost of the vehicles, reduced fuel consumption and travel time. 3 Agriculture The area where the road passes is an agricultural area for mainly sorghum. The improvement of the road will ease problems of transporting farm inputs and produce to and from various markets. 4 Employment Creation and Business Boosting The people around the area of the road project will also benefit by getting employed in various road activities by the Contractor. During project implementation and after, a lot of businesses will be enhanced along the project road and the communities will be empowered economically. 5 Inter-Border Trade It is hoped that the improvement of the road will enhance movement of goods between the two countries of Mozambique and Malawi, thereby boosting trade. 6 Reduction of travel time The construction of the road will help reduce the travel time thereby increasing the people productive time to work and businesses.

Start date: 2021-04-23 Due date: 2022-02-22 Approval date: 2019-07-01
5,361,576,130.35   MWK
Total Funding
2021-11-16
Date Created
2021-11-16
Last updated
Construction
Project Type
Implementation
Project Status
Absence of a clear feasibility study Unrealistic budgets Limited assessment of environmental impacts Limited assessment of social impacts Limited assessment of economic impacts Weak stakeholder engagement Change of scope Cost overruns and budget inflation Lack of transparency in procurement processes Limited competition Favoritism in bidding processes Political interference Weak accountability mechanisms Frequent project delays (time overruns) Environmental violations Social violations Lack of maintenance plans Under-utilization of project Abandonment of project

Locations

Description NSANAMA
District Machinga
Region Southern
Street address
Postal code

Documents

No records were added

Parties

Description Roads Authority
Locality Lilongwe
Region Central Region
Street address Functional Building Off Paul Kagame Road P/Bag B346 Lilongwe 3 Malawi
Postal code 0000
Country Malawi
Telephone 01 759 154
Fax Number 1 750 307
URL https://www.ra.org.mw
Description The Malawi Roads Authority (RA) is a quasi government body which was established by an Act of Parliament in year 2006 with a mandate to ensure that public roads are maintained, rehabilitated at all times. The network is made up of Main Roads, Secondary Roads, Tertiary Roads ending with trucks and trails on the lowest level.

Contracts

No records were added

Budget

Description Bughet
Amount MWK 5,361,576,130.35
Start Date 2021-04-23
End Date 2022-02-22
Max Extent Date
Duration In Days 305
Party ID Ministry of Transport and Public Works-Lilongwe-MW
URI

Project Funding

No records were added
No comments added

Environment

No record was added

Completion

End Date:
End Details:
Final Scope:
Final Scope Details:
Final Value Amount: 0.00
Final Value Details:

Finances

No records were added

Milestones

No records were added

Transactions

No records were added

Benefits

No records were added

Additional Classifications

No records were added

Social

No records were added

Metrics & Forecasts

No records were added

Policy

No record was added

Timelines

© 2025, Construction Sector Transparency Initiative (CoST Malawi). All Right Reserved;

All content on the platform is licensed under Creative Commons Attribution 4.0 Unported License.