Project

construction of a 30 tonne capacity concrete deck bridge at Mapembe in T/A Kalumbu

Return
image

construction of a 30 tonne capacity concrete deck bridge at Mapembe in T/A Kalumbu

removal of an existing timber deck, planting of dowels and decking using Reinforced concrete

to improve transport conditions during rainy season

Start date: 2025-03-12 Due date: 2025-09-12 Approval date: 2024-03-06
168,912,000.00   MWK
Total Funding
2025-03-25
Date Created
2025-03-25
Last updated
Construction
Project Type
Implementation
Project Status
Absence of a clear feasibility study Unrealistic budgets Limited assessment of environmental impacts Limited assessment of social impacts Limited assessment of economic impacts Weak stakeholder engagement Change of scope Cost overruns and budget inflation Lack of transparency in procurement processes Limited competition Favoritism in bidding processes Political interference Weak accountability mechanisms Frequent project delays (time overruns) Environmental violations Social violations Lack of maintenance plans Under-utilization of project Abandonment of project

Locations

Description Mapembe in T/A Kalumbu
District Lilongwe
Region Central
Street address
Postal code

Documents

No records were added

Parties

Description Lilongwe District Council
Locality Post Office Box 93, Lilongwe
Region Central
Street address Lilongwe
Postal code 0000
Country Malawi
Telephone 09000000000
Fax Number
URL
Description
Description World Bank
Locality Washington, DC
Region District of Columbia
Street address 1818 H Street, NW Washington, DC 20433 USA
Postal code 20433
Country United States of America (the)
Telephone +1 (202) 473-1000
Fax Number
URL www.worldbank.org
Description The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. It comprises two institutions: the International Bank for Reconstruction and Development (IBRD), and the International Development Association (IDA). The World Bank is a component of the World Bank Group.

Contracts

No records were added

Budget

No records were added

Project Funding

No records were added
No comments added

Environment

Abatement Cost AMD 797,987,987.98
Goals Climate change mitigation
Oversight Types Internal

Impact Categories

Scheme International Finance Corporation’s Policy on environmental and social sustainability
Description Dolore aliquid ut qu
URL Vero maiores et sint

Climate Measures

Type Climate risk analysis, Reduction of embodied emissions, Reduction of embodied energy, Location analysis, Regenerative design
Description Sed nulla amet mole

Conservation Measures

Type Biological corridors
Description Alias iusto a consec

Environmental Measures

Type Environmentally responsible use of land, water and air
Description Similique eveniet e

Completion

End Date:
End Details:
Final Scope:
Final Scope Details:
Final Value Amount: 0.00
Final Value Details:

Finances

No records were added

Milestones

No records were added

Transactions

No records were added

Benefits

No records were added

Additional Classifications

No records were added

Social

No records were added

Metrics & Forecasts

No records were added

Policy

No record was added

Timelines

© 2025, Construction Sector Transparency Initiative (CoST Malawi). All Right Reserved;

All content on the platform is licensed under Creative Commons Attribution 4.0 Unported License.